MODERNWASH.NET
  • Home
  • Getting Started
    • Services
  • Recent Projects
  • Modern Design Sells
    • Why I Need A Modernwash
    • Why Design Is Important >
      • Market Engineering
    • Modernwash Is The Choice
  • Models
    • Axiom >
      • Prime >
        • Prime -X
      • Axiom Beta / 518e
      • Micro
      • OXR
      • MXR
      • Wave
    • Metrocurve >
      • Metrocurve 501e
      • Metrocurve 518e >
        • Metrocurve 518-X
      • Metrocurve XTC
      • Metrocurve 550e
      • Metrocurve Modified
    • FuelCity >
      • Triton
    • Neowash
    • Urbanwash
    • Custom
    • X-SERIES
  • Technical
    • Modern Design
    • Green
    • Typical Drawings >
      • Design Tools
      • Typical Installation
    • Colors >
      • i-5 Frame Finish
    • Roof Systems >
      • Roof Colors
    • Wall Options >
      • Adaptable
    • Interior Layout
    • Architects
  • Gallery
    • Modernwash Photos
    • Renders
    • Video / Animations
  • About Us
    • Our Philosophy >
      • Core Values
    • Careers
    • Media
    • Legal
  • Contact
  • Subscribe
  • New Fuel Models
  • Newsletter Fall 2025
  • Flex Frame System
Picture

Typical Installation



People ask what a typical time line is to erect and install our structures.
Of course this depends upon many factors such as the size of your building/project, the style of your building and the intensity of your design.
Typically most of our buildings are built within seven days or less, but with larger tunnels and more intense designs this timeframe can increase.
One of the really nice things about our structures is that shortly after we start the building, your other professionals can start their scope of work while we are still erecting the rest of the framework. this layering of work definitely increases the total build timeframe.
Take a look a this actual build /erection of a recent project.

Modernwash Typical Construction TimelinePDF >

Typical Construction Timeline

This project features our Metrocurve model with stacked stone cladding.
Project Features: 
  • Metrocurve Model
  • Clerestory Glass System
  • R-Panel Combination Roof System
  • Indian Red Summer TGIC Poly Powder Coat Finish
  • Galva Stud Wall Framing with Sheeting
  • PVC Tongue and Groove Equipment oom Divisor Wall System
  • i-5 Glazing System 
  • i-5 Curved Roof Entry Canopy
  • Type 3 Pay Station Canopies
  • Wall Prep for Cladding
  • Stacked Stone Veneer

Metrocurve 

Services

Getting Started
Models
​Photos

Company

About
Our Philosophy
Core Values

Support

Contact
Human Design
Home
​Subscribe
Picture

1.800.511.7208

270-781-6632  / 270-842-1652
© COPYRIGHT 2025 Modernwash, Inc.. ALL RIGHTS RESERVED.
  • Home
  • Getting Started
    • Services
  • Recent Projects
  • Modern Design Sells
    • Why I Need A Modernwash
    • Why Design Is Important >
      • Market Engineering
    • Modernwash Is The Choice
  • Models
    • Axiom >
      • Prime >
        • Prime -X
      • Axiom Beta / 518e
      • Micro
      • OXR
      • MXR
      • Wave
    • Metrocurve >
      • Metrocurve 501e
      • Metrocurve 518e >
        • Metrocurve 518-X
      • Metrocurve XTC
      • Metrocurve 550e
      • Metrocurve Modified
    • FuelCity >
      • Triton
    • Neowash
    • Urbanwash
    • Custom
    • X-SERIES
  • Technical
    • Modern Design
    • Green
    • Typical Drawings >
      • Design Tools
      • Typical Installation
    • Colors >
      • i-5 Frame Finish
    • Roof Systems >
      • Roof Colors
    • Wall Options >
      • Adaptable
    • Interior Layout
    • Architects
  • Gallery
    • Modernwash Photos
    • Renders
    • Video / Animations
  • About Us
    • Our Philosophy >
      • Core Values
    • Careers
    • Media
    • Legal
  • Contact
  • Subscribe
  • New Fuel Models
  • Newsletter Fall 2025
  • Flex Frame System