• Home
  • Getting Started
    • Services
  • Recent Projects
  • Modern Design Sells
    • Why I Need A Modernwash
    • Why Design Is Important
    • Market Engineering
    • Modernwash Is The Choice
  • Models
    • Axiom >
      • Prime >
        • Prime -X
      • Axiom Beta / 518e
      • Micro
      • OXR
      • MXR
      • Wave
    • Metrocurve >
      • Metrocurve 501e
      • Metrocurve 518e >
        • Metrocurve 518-X
      • Metrocurve XTC
      • Metrocurve 550e
      • Metrocurve Modified
    • FuelCity >
      • Triton
    • Neowash
    • Urbanwash
    • Custom
    • X-SERIES
  • Technical
    • Modern Design
    • Green
    • Typical Drawings >
      • Design Tools
      • Typical Installation
    • Colors >
      • i-5 Frame Finish
    • Roof Systems >
      • Roof Colors
    • Wall Options >
      • Adaptable
    • Interior Layout
    • Architects
  • Gallery
    • Modernwash Photos
    • Renders
  • About Us
    • Our Philosophy >
      • Core Values
    • Careers
    • Media
    • Legal
  • Contact
  • Subscribe
  • Show Special 2020
  • Newsletter Six Fall 2020
Modernwash.net
Picture

Construction: Speed + Simplicity

Speed during the construction process has a real impact on your bottom line in multiple ways.

Our projects regularly trim weeks and months of the typical construction process compared to a conventional block structure. This can save the entrepreneur on property taxes, insurance and mortgage liability costs that would otherwise add up over time. 

Not just cost-savings: your business starts making money faster when using a pre-engineered building. 

The Modernwash building system has been thoroughly reviewed in advance in order to decrease issues during construction. With a general contractor who is on your side (And not all of them are. Here are some things to look out for) the structure can be erected quickly using less skilled labor and fewer change orders.

A pre-engineered system has been designed and thought out before the materials land on the project site. We’ll give you a takeoff sheet, as well as detailed installation notes to simplify the process. We’ll have someone onsite for assistance, and we’ll kick off the process with a call with your entire team so everyone is on the same page from day one.

The system is made from HSS Structural Steel with a pre-finished powder coat finish, all which meets all codes and requires no welding while still creating a hidden-bolt connection with a clean appearance.
System Benefits
Site Design
Initial Design Info

Picture

Services

Getting Started
Models
Price 
​Photos

Company

About
Our Philosophy
Core Values

Support

Contact
Human Design
Home
​Subscribe
Picture

1.800.511.7208

© COPYRIGHT 2020 Modernwash, Inc.. ALL RIGHTS RESERVED.